MCC-3 · Bucket 4B
Boiler Room · Square D QO-200
NFPA Condition 2
| Point | Temp | Δ Amb |
| Line side · Phase A | 148.1°F | +76° |
| Line side · Phase B | 189.2°F | +117° |
| Line side · Phase C | 145.6°F | +74° |
Inspector notes
Re-torque the phase B line-side lug to spec and re-inspect under load.
THERMALSYNC · REPORT TS-0914 · CONFIDENTIALPAGE 7 OF 14
Inspection summary
By severity
Open exceptions
| EX-K7QF2 | MCC-3 | Phase B connection overheating |
| EX-P4ZT8 | Chiller 1 | Hot bearing |
| EX-M2HX5 | Transformer A | Elevated neutral bar |
Equipment summary
THERMALSYNC · REPORT TS-0914 · CONFIDENTIALPAGE 2 OF 14
Report TS-0914
Thermal Inspection Report
Q3 Thermal Survey · Plant 2, Riverside
- Inspection date
- Sep 14, 2026
- Prepared by
- J. Ruiz
- Status
- Issued
- Pages
- 14